Baltic Quays
Apartment complex
Location: London

Address: Baltic Quays Sweden Gate London SE16 7TJ
Passive Fire Protection London – Scope of Works
At Fireholt Fire Protection Ltd, we completed a comprehensive passive fire protection project at an apartment complex located at Baltic Quays, Sweden Gate, London, SE16 7TJ. This project involved working alongside the main contractor to deliver effective and durable fire safety solutions for the property. Our team supplied and installed 60-minute passive fire protection and 60-minute intumescent fire protection using Jotun Steelmaster, making sure the highest standards of fire safety were achieved.
Expert Passive Fire Protection Techniques
Our work primarily focused on the application of Intumescent Paint throughout the building. This, combined with high-quality materials like Jotun Steelmaster products, guaranteed a robust barrier against the spread of fire, offering the occupants critical time in the event of an emergency.
SteelMaster are thin-film intumescent coatings provide structural steel with protection against cellulosic fires. Formulated to deliver a thermal insulation and cooling effect with a duration of up to 180 minutes, SteelMaster coatings simultaneously enhance the beauty of steel design throughout the apartment complex.
Full Compliance & Traceability
All tasks undertaken during this project were meticulously recorded for complete traceability. Using Firearrest software, we documented every stage of the work, making sure that all installations met the required safety standards.
What Is IFC Certification?
As part of our commitment to quality and compliance, all the fire protection work completed at Baltic Quays was fully IFC certified. The International Fire Consultants (IFC) certification is a globally recognised standard that demonstrates the work has been independently assessed and meets rigorous fire safety requirements. This certification provides assurance to clients, contractors, and building owners that the passive fire protection systems installed are reliable, effective, and compliant with current regulations. For this apartment complex in London, the IFC certification process underpinned our dedication to delivering safe and high-quality fire protection solutions.
Completed On Time, To A High Standard
We successfully completed the project in June 2023, delivering a fully functional and compliant fire protection system. The collaboration with the main contractor allowed us to integrate seamlessly into the project timeline, making sure the work was completed efficiently and professionally.
Fireholt Fire Protection Ltd is proud to have contributed to the safety of this prominent apartment Complex in London. Our team’s dedication to quality and safety highlights our reputation as a leading provider of passive fire protection solutions.